Mindanao Grid Alert Status | 10 June 2026, 11AM

Update as of 10 June 2026, 11AM

Yellow Alert
12:00PM-3:00PM

Available Capacity – 2,731MW
Peak Demand – 2,611MW

12 plants are on forced outage on June 2026, 3 plants are on forced outage since May 2026, 1 plant since September 2025, and 2 plants since 2024, while 33 plants are running on derated capacities, for a total of 1,259.9MW unavailable to the grid.

Factor/s that contributed to the declaration of Yellow Alert:

1. Tripping of GNPK 4

2. Large capacity coal plants namely SEC 1, SEC 2, SMC 1 and SMC 2 still on forced outage as affected by the recent high magnitude earthquake

3. Unavailability of FDC 3 due to boiler tube leak

4. High demand forecast

A yellow alert is issued when the operating margin is insufficient to meet the transmission grid’s contingency requirement.

#NGCPAdvisory