Ongoing flood control works along the riverbank in Taal 2, Bangkal, Davao City on Monday (Aug. 17, 2026). The project includes the installation of gabion structures along Talomo River. The area was severely flooded on July 24, prompting the Department of Public Works and Highways to order the immediate repair of the flood-control dike and dredging of the river. | PNA photos by Robinson Niñal Jr.
Home DPWH 11 speeds up flood control projects as Talomo works continue Ongoing flood control works along the riverbank in Taal 2, Bangkal, Davao City on Monday (Aug. 17, 2026). The project includes the installation of gabion structures along Talomo River. The area was severely flooded on July 24, prompting the Department of Public Works and Highways to order the immediate repair of the flood-control dike and dredging of the river. | PNA photos by Robinson Niñal Jr.
Ongoing flood control works along the riverbank in Taal 2, Bangkal, Davao City on Monday (Aug. 17, 2026). The project includes the installation of gabion structures along Talomo River. The area was severely flooded on July 24, prompting the Department of Public Works and Highways to order the immediate repair of the flood-control dike and dredging of the river. | PNA photos by Robinson Niñal Jr.